Shared-Use Pathway 30% Design

The Howard County Office of Transportation is advancing the Clarksville/River Hill Streetscape Design Guidelines by developing 30% design plans for a shared-use pathway alongside Clarksville Pike between Guilford Road and Linden-Linthicum Lane.

A public meeting to present draft 30% plans was held on Thursday, January 31, 2019 at 7:00 p.m. at River Hill High School. The following materials were presented at the January 31, 2019 public meeting:

  1. PowerPoint Presentation
  2. MD 108 Option 1 Page 1
  3. MD 108 Option 1 Page 2
  4. MD 108 Option 2 Page 1
  5. MD 108 Option 2 Page 2
  6. MD 108 Board 1
  7. MD 108 Board 2

To provide a comment, or for more information, call (410) 313-3842.

Or contact Transportation Email

Traffic Study and Preliminary Engineering

A traffic study and accompanying preliminary engineering for Clarksville Pike were conducted in 2015. Traffic studies are for informational purposes, and they are not adopted as policy by the County. However, the traffic study serves to help the County in its work with State Highway Administration to anticipate needed roadway improvements.

Clarksville Pike Multi-Modal Traffic Study and Preliminary Engineering

Stay Connected!

Sign up for the County Executive's weekly newsletter and stay up to date on everything Howard County.
 

Zip Code