Sucker Branch/Sylvan Lane Sewer Overflow
Utility crews have completed the work to stem the flood-related sewage spill on the Sucker Branch off of Sylvan Lane. Pictures of the extraordinary measures used as well as the dedication of the Utility crews to stop the spill are posted below. Click on an Image to view in greater detail


Chopper Chopper 2 Chopper 3 Chopper 9


Sucker Branch Sucker Branch Overflow Utility Crews

 

Crews loading Pipe Taking Off Pump being dropped off Setting up the pump 

Pump Crews setting up hoses Crews setting up hoses 

 

Long lengths of hose to set up

 

Enter Title