![]() |
|||||||
| Advanced Searching... | |||||||
![]() |
Home | Site Directory | Contact Info | ||||||
|
WATER/SEWER CONNECTION The Department of Planning and Zoning, Development Engineering Division, is responsible for review and approval of water and sewer connections to the public utility to assure there are no conflicts with any regulations pertaining to recorded easements, wetlands, or floodplains. DEPARTMENT OF PLANNING AND ZONING WHEN APPROVAL IS REQUIRED The Development Engineering Division is a signatory of the permit process for:
WHAT TO EXPECT A building permit application received by the Department of Inspections, Licenses and Permits is automatically sent to the Development Engineering Division for their review and approval prior to issuance of the building permit. After issuance of the building permit, water and sewer construction may be installed. However, all work of this type must be done by a licensed plumber or utility contractor, and a separate plumbing permit is required for the connection to the structure. EXPEDITING THE APPROVAL PROCESS The Development Engineering Division requires specific information to be shown on the plan and noted on the permit, such as:
WHO TO CALL FOR ASSISTANCE:
|
|||||||
![]() |
|||||||
|
Top | Conditions of Use | Privacy Policy | Website Accessibility |
|||||||
|
© Copyright 2002-2007 - Howard County, MD Government. All Rights Reserved. |
|||||||